Project Update: Waterproofing Mock-Up

Share

A proposed detail for one of our projects was constructed as a mock-up by The Waterproofing Company at SGH’s lab.

The proposed detail takes the shear studs out of play, placing a termination bar vertically on either side of the shear stud. Schnabel provided the steel, and scraped up to match conditions after excavation. Although the mock-up assembly was completed last Thursday, it will take some time for the liquid membrane to cure completely. The project team awaits the results of the water test!