Managing Complexity, Creating Care

A private two-story glass lobby welcomes patients with warm wood finishes, natural light, and a calming atmosphere. Expansive glass, exposed wood, and soft lighting create an uplifting environment for patients and families. Extensive sitework and carefully phased tie-ins to the existing hospital ensured uninterrupted care throughout construction.

“Each company has been at the table since the first day, all working steadfastly to achieve the shared goal of building an innovative patient-centered facility where patients will come with the hope of living with the best quality of life possible. This experience has verified for me that I will never build a hospital any other way than through IPD.”
Candra Szymanski, MS, RN, Marlborough Hospital
From Model to Milestone

TOCCI utilized BIM to visualize complex tie-ins to the existing hospital, optimize sequencing, and identify potential conflicts before construction. It supported design analysis, coordination, and logistics, including mapping requirements and installation of the linear accelerator (LINAC). The BIM validated compliance with strict penetration requirements for the LINAC vault and modeled the equipment path, revealing the need for “out of sequence” casework and wall finishes. This approach streamlined collaboration, minimized delays, and kept the hospital fully operational throughout construction.

Integrated Project Delivery

The Marlborough Cancer Pavilion was New England’s first healthcare project completed under Integrated Project Delivery (IPD). Early alignment between the hospital, architects, and subcontractors allowed the team to anticipate challenges, test construction sequencing, and resolve potential conflicts before breaking ground

Sustainability

Built to LEED standards, the Cancer Pavilion captures rainwater from roof drains via a rain chain system. Stored water feeds both water features and landscaping, reducing water use while enhancing the healing environment.

Active Hospital Construction

TOCCI managed system tie-ins with minimal shutdowns, redirected pedestrian and staff traffic, enforced strict containment protocols to keep patient areas clean, and prioritized safety throughout the project, ensuring hospital services continued uninterrupted.

Infinite possibilities 
in defined spaces